CITY COUNCIL MINUTES
The City Council of the City of West University Place, Texas, remotely met in a workshop on Monday, July
20, 2020, at 5:00 p.m. in the Municipal Building located at 3800 University Boulevard.
Agenda items were as follows:
WORKSHOP (5:00 PM)
1. Call Workshop to Order
Mayor Higley called the workshop to order at 5:02 p.m. from the City Hall Conference Room. Mayor
Pro Tem Trautner, Councilmembers Barnes, Lankford and Sobash were in attendance via
video/teleconference.
City Manager Beach, City Secretary Gilliam, City Attorney Petrov, and Public Works Director Barrera
were physically present in the Council Chambers.
Also physically in attendance were Nawa Panthi and Hui-Fong Change with HTJ Engineers
John Robuck with BOK Financial Services attended via video/teleconference.
2. Drainage/Modeling Study
Matters related to the City’s Drainage/Modeling Study and funding sources.
Nawa Panthi with HTJ Engineers provided a follow-up to the drainage/modeling study workshop held
on June 22, 2020. The focus of the discussion was mainly on the City’s five major drainage systems:
• Academy Street System
• College Street System
• Poor Farm Ditch
• Buffalo Speedway System
• Kirby Drive System
At the conclusion of the presentation/discussions, it was noted that:
• Proposed storm Sewer Improvements provide nearly 50-yearLevel-of-Service (LOS)
• Estimated Cost Of Proposed Improvements
o Estimated cost of road and associated drainage improvements, $21M. (Priority Area 1-
3 of Infrastructure Program)
These roadways will need replacement in the next five years, if not sooner
City Council Meeting Minutes, July 20, 2020
2 of 2
o Estimated cost of the proposed drainage improvements, total $39M.
o Total estimated cost of improvements, $60 Million (in today’s dollars)
After the presentation by HTJ engineers and questions and answers, Mr. John Robuck with BOK
Financial Services discussed funding and possible funding sources.
A copy of the drainage presentation is attached.
3. Virtual Gate Discussion
Matters related to Phase I of the Virtual Gate project.
City Manager Beach proposed that staff be allowed to move forward with a decorative base for poles
within the City of West U City limits for this project, which would cost approximately $80,000 and be on
target for completion by the end of the year.
It was the consensus of Council for Mr. Beach to move forward as proposed.
4. Adjourn
Mayor Higley adjourned the workshop at 7:10 p.m.
Audio of this workshop is available on the City’s website or contact the City Secretary’s office to obtain a copy.
Prepared by: City Secretary Thelma A. Gilliam
Approved by City Council on: August 10, 2020
1
City of West University Place
Citywide Storm Sewer Analysis
Prepared for:Prepared by:
July 20, 2020
Attachment to July 20, 2020 Minutes
2
Additional Results Discussion
Agenda
4
Existing Conditions
Flooding Conditions for Different Rain Events
Major Drainage
Systems
5
Results / Findings
Existing 2-Year Inundation Map
6
Results / Findings
Existing 10-Year Inundation Map
7
Results / Findings
Existing 50-Year Inundation Map
8
Results / Findings
Existing 100-Year Inundation Map
9
Existing Conditions
Flooding Conditions 100-Year Vs Harvey Reported Structure Flooding
10
Results / Findings
Existing 100-Year Inundation Map
Ground Elev.: 55.2 ftF.F. Elev.: 55.9 ftWSEL: 55.7 ft
Ground Elev.: 49.0 ftF.F. Elev.: 49.8 ftWSEL: 49.4 ft
WSEL = Water Surface Elevation
11
Proposed Conditions
Flooding Conditions Comparison
Existing Vs Proposed
Without Restrictor
12
Road
Reconstruction
* Work includes road and storm sewer replacement needed within the next 5 years.
13
Results / Findings
Proposed Improvements Estimate$60M*
Along Community
Drive and shared
line at city limit
* Estimated cost for drainage upgrades and associated road replacement for sections as shown
14
Results / Findings
Existing 100-Year Inundation Map
Note Appearance of Black hatch in the proposed conditions indicates the improvement to the flooding conditions
15
Results / Findings
Existing 100-Year Inundation Map
Note Appearance of Black hatch in the proposed conditions indicates the improvement to the flooding conditions
16
Results / Findings
Existing 100-Year Inundation Map
Note Appearance of Black hatch in the proposed conditions indicates the improvement to the flooding conditions
17
Results / Findings
Existing 100-Year Inundation Map
Note Appearance of Black hatch in the proposed conditions indicates the improvement to the flooding conditions
18
Proposed Conditions
Flooding Conditions Comparison
Existing Vs Proposed
With Restrictor
19
Results / Findings
Proposed Improvements Estimate$60M*
Along Community
Drive and shared
line at city limit
* Estimated cost for drainage upgrades and associated road replacement for sections as shown
20
Results / Findings
Existing 100-Year Inundation Map
Note Appearance of Black hatch in the proposed conditions indicates the improvement to the flooding conditions
21
Results / Findings
Existing 100-Year Inundation Map
Note Appearance of Black hatch in the proposed conditions indicates the improvement to the flooding conditions
22
Results / Findings
Existing 100-Year Inundation Map
Note Appearance of Black hatch in the proposed conditions indicates the improvement to the flooding conditions
23
Results / Findings
Existing 100-Year Inundation Map
Note Appearance of Black hatch in the proposed conditions indicates the improvement to the flooding conditions
24
Buffalo Speedway Improvement
25
Results / Findings
Proposed Improvements
Buffalo Speedway
Improvements
26
Results / Findings
Existing 100-Year Inundation Map
Note Appearance of Black hatch in the proposed conditions indicates the improvement to the flooding conditions
27
Results / Findings
Existing 100-Year Inundation Map
Note Appearance of Black hatch in the proposed conditions indicates the improvement to the flooding conditions
28
Results / Findings
Existing 100-Year Inundation Map
Note Appearance of Black hatch in the proposed conditions indicates the improvement to the flooding conditions
29
Results / Findings
Existing 100-Year Inundation Map
Note Appearance of Black hatch in the proposed conditions indicates the improvement to the flooding conditions
30
Water Surface Comparison at
Selected Locations
Locations of
Cross Sections
31
Typical WSEL Drop Vs Horizontal Shift
10 ft
9 ft
13 ft
32
3 inches
6 inches
6 inches
•At the critical elevation (near door step), the shift ismore than the average shift (est.10 ft. for 3 inches drop)
•This is a typical section, not relevant to any storm event–only the relationship based on the slope
•Average shift = 6ft. per 3 inches drop.
33
WSEL Existing
WSEL Proposed w/ Restrictor
WSEL Proposed w/o Restrictor
•Cross Sections were taken buildingto building from 2018 LiDAR
•Vertical Line at the end indicate theface of the structure.
•ROW is approximate
Building Front Line -Typical
Street ROW
Natural Ground
No WSEL line means the WSEL is below the street elevation
WSEL = Water Surface Elevation
WSEL = Water Surface Elevation
34
WESEL Existing
Proposed w/ Restrictor
Proposed w/o Restrictor
Street ROW
WSEL Existing
WSEL Proposed w/ Restrictor
WSEL Proposed w/o Restrictor
No WSEL line means the WSEL is below the street elevation
WSEL = Water Surface Elevation
35
Existing
Proposed w/ Restrictor
Proposed w/o Restrictor
Street ROW
WSEL Existing
WSEL Proposed w/ Restrictor
WSEL Proposed w/o Restrictor
No WSEL line means the WSEL is below the street elevation
WSEL = Water Surface Elevation
36
Existing
Proposed w/ Restrictor
Proposed w/o Restrictor
Street ROW Street ROW
WSEL Existing
WSEL Proposed w/ Restrictor
WSEL Proposed w/o Restrictor
No WSEL line means the WSEL is below the street elevation
WSEL = Water Surface Elevation
37
Existing
Proposed w/ Restrictor
Proposed w/o Restrictor
Street ROW Street ROW
WSEL Existing
WSEL Proposed w/ Restrictor
WSEL Proposed w/o Restrictor
No WSEL line means the WSEL is below the street elevation
WSEL = Water Surface Elevation
38
Existing
Proposed w/ Restrictor
Proposed w/o Restrictor
Street ROW Street ROW
WSEL Existing
WSEL Proposed w/ Restrictor
WSEL Proposed w/o Restrictor
No WSEL line means the WSEL is below the street elevation
WSEL = Water Surface Elevation
39
Existing
Proposed w/ Restrictor
Proposed w/o Restrictor
Street ROW
No WSEL line means No-Ponding in the street
Street ROW
WSEL Existing
WSEL Proposed w/ Restrictor
WSEL Proposed w/o Restrictor
No WSEL line means the WSEL is below the street elevation WSEL = Water Surface Elevation
40
Existing
Proposed w/ Restrictor
Proposed w/o Restrictor
Street ROW Street ROW
WSEL Existing
WSEL Proposed w/ Restrictor
WSEL Proposed w/o Restrictor
No WSEL line means the WSEL is below the street elevation
WSEL = Water Surface Elevation
41
Street ROW Street ROW
No WSEL line means the WSEL is below the street elevation WSEL = Water Surface Elevation
WSEL Existing
WSEL –Buffalo Speedway
WSEL -Proposed
42
Street ROW
No WSEL line means the WSEL is below the street elevation
WSEL = Water Surface Elevation
Street ROW
WSEL Existing
WSEL –Buffalo Speedway
WSEL -Proposed
43
No WSEL line means the WSEL is below the street elevation
WSEL = Water Surface Elevation
Street ROW Street ROW
WSEL Existing
WSEL –Buffalo Speedway
WSEL -Proposed
44
No WSEL line means the WSEL is below the street elevation
WSEL = Water Surface Elevation
Street ROW Street ROWWSEL Existing
WSEL –Buffalo Speedway
WSEL -Proposed
45
No WSEL line means the WSEL is below the street elevation
WSEL = Water Surface Elevation
Street ROW Street ROW
WSEL Existing
WSEL –Buffalo Speedway
WSEL –Proposed
46
No WSEL line means the WSEL is below the street elevation
WSEL = Water Surface Elevation
Street ROW Street ROW
WSEL Existing
WSEL –Buffalo Speedway
WSEL –Proposed
47
No WSEL line means the WSEL is below the street elevation
WSEL = Water Surface Elevation
WSEL Existing
WSEL –Buffalo Speedway
WSEL –Proposed
Street ROW Street ROW
48
No WSEL line means the WSEL is below the street elevation
WSEL = Water Surface Elevation
WSEL Existing
WSEL –Buffalo Speedway
WSEL –Proposed
Street ROW Street ROW
49
Results / Findings
Proposed Improvements Estimate$60M*
Priority Areas 1-3P
New Proposed Pipes
* Cost is in today'sdollars
Est. Cost = $21M
Est. Cost = $39M
50
•Proposed storm Sewer Improvements provide nearly 50-yearLevel-of-Ser vice (LOS)
•Estimated Cost Of Proposed Improvements
•Estimated cost of road and associated drainageimprovements, $21M. (Priority Area 1-3 of InfrastructureProgram)
o These roadways will need replacement in the next five years,if not sooner.
•Estimated cost of the proposed drainage improvements,total $39M.
•TOTAL EST. COST OF IMPROVEMENTS = $60 Million*
(*shown in today's dollars)
Conclusion
51
Questions & AnswersThank You