Loading...
HomeMy WebLinkAboutWUP Park Restroom PresentationPUBLIC RESTROOMS IN PARKS 1. ASSOCIATED STIGMAS 2. RESULTING ACTIONS 3. CORWORTH SOLUTIONS 4. DESIGN / COSTS 5. WHY CORWORTH? 1 1. ASSOCIATED STIGMAS SANITARY CONCERNS Hard To Clean Stink Unsanitary 2 1. ASSOCIATED STIGMAS SAFETY CONCERNS Poor Lighting Inviting To Predators Securing After Hours Site Construction 3 1. ASSOCIATED STIGMAS AESTHETIC CONCERNS Unsightly Poor Construction Utilitarian Bland 4 2. RESULTING ACTIONS No Restrooms At All Peeing In Bushes Peeing In Pants Lower Park Usage Higher Chance Of Vandalism 5 3. CORWORTH SOLUTIONS EASY TO MAINTAIN Epoxy Floor Finish FRP Wall Finish Wall Mount Fixtures Central Utility Chase 6 3. CORWORTH SOLUTIONS FEATURES 8,000 PSI Slab Red Shield Coated Lumber Continuous Door Hinge Polycarbonate Louvers Vandal-Resist LED Lighting 7 3. CORWORTH SOLUTIONS DESIGN Sizing Per Usage, Not Acreage Seismic Category D, 130 MPH Wind Load Architectural Flexibility 8 3. CORWORTH SOLUTIONS CMS CorWorth Management System (CMS) Auto Water Sensor / Shutoff Auto Door Locks Lighting Control After Hour Motion Alert Customizable Control / Receive Alerts Via Cell Phone, etc. 9 3. CORWORTH SOLUTIONS FAST INSTALL 4-5 Day Site Install 10 4. DESIGN / COSTS DESIGN Model #W101 For Pocket Parks 108 Square Feet Epoxy Floor Finish FRP Interior Wall Finish Vitreous China Toilet & Sink LED Lights Hand Dryer Open, Cathedral Ceiling Composition Shingles 11 4. DESIGN / COSTS COSTS 12 5. WHY CORWORTH? Our prefabricated restroom buildings add value to a park We are the architect, engineer, builder, freight, crane & installer Construction time is approximately 80 days after plan approvals Life cycle of 40-50 with little maintenance to the building itself Buildings carry a 5-year warranty Safety and hygiene designed into each building Vandalism, odors and substandard materials designed out of each building Minimal disruption to the park during installation Ability to design to each park theme No fee preliminary design and consulting 13