Loading...
HomeMy WebLinkAboutFMinutes010913_Page_08System has been ordered from the factory and is currently being fabricated. Goal is to have the new system installed by the end of February 2013. o Playground will be closed for approximately three (3) weeks. Whitt Johnson Park 5 - 12 Year Olds Play Feature: Refurbishing of this system will be facilitated during the same period as the 2 - 5 year olds play system is being installed. Wier Park Artificial Shade Structure: Purchase Order will be issued on or before 12/14/2012. Once P.O. is received, the process of the shade structure install will commence. Shade panels will be beige and green in color - post will be beige in color. Estimated 4 - 8 weeks for engineered drawings, permits and fabrication. Installation is estimated to take 2 weeks and project completed by 03/08/2013 All portions of the park, other than the 5-12 year olds play area, will remain open to the public during the project. New Colonial Park Play Features: Purchase Order was issued to GameTime on 12/06/2012. Color Schemes have been selected - consistent with existing structures. Specific Play Features: o See-Saw, Talk-Tubes, GT Jams Fun-Semble and Rockscape Rock & Web Climber. Portions of the Playground will be closed for during the installations. Goal is to have the new play features installed by the end of February 2013.