Loading...
HomeMy WebLinkAbout07202004 BSC Minutes WS City of West University Place ® A Neighborhood City ® Recycled Paper Building & Standards Commission 3826 Amherst Street Public Works Department Conference Room Foundation Workshop Meeting Minutes July 20th 2004 MEMBERS PRESENT: Bryant Slimp and John Ayres. MEMBERS ABSENT: David Flame, Dr. Peter Benjamin, J. Dennis Powers, Darryl Friday, Brian Hoogendam, Muddy McDaniel and Kevin McMahon. COUNCIL LIASION: Mike Woods, absent. STAFF PRESENT: Annette Arriaga, Dennis Mack and Jim Dougherty. GUESTS PRESENT: Craig Hughes, David Eastwood P.E., Les Albin, Marie J. Starich, P.E., Martin Gonzales, Michael Skoller P.E. and Robert Riquelmy. [Call to Order.] With a quorum, present Bryant Slimp called the meeting to order at 6:10 p.m. 1. Foundations. Mr. David Eastwood, P.E. went over his Recommended Scope of Geotechnical Engineering Services for the City of West University, Dated May 2004. He stated that he wants to take foundation requirements a step further and better the quality assurance for foundations. The estimated cost that he has indicated in his Recommended Scope would be $1,200. dollars. Marie Starich P.E., Michael Skoller P.E., and David Eastwood P.E., discussed the differences between the different types of quality control and testing and if certain tests would be required and necessary. After lengthy discussion David Eastwood would put in minimum requirements and be more prescriptive in his next report. David Eastwood would make modification to his draft and e-mail the changes to staff to distribute to BSC. Dennis Mack stated that he wanted to put in some accreditation criteria into the ordinance language, that the City draft would draft an official document requiring the engineer stamp and sign it making the engineer responsible for the foundation work. Jim Dougherty stated that these two additions would be wise. Discussion continued on who is responsible during the whole or part of the pour. Marie Starich P.E., and Michael Skoller P.E., continued on what steps are followed and who is responsible, for what at the job site, the Geotech or the Engineer. John Ayres agreed that there are different contracts going on with the builder or owner, and several different people involved. Mr. Ayres stated that we want to keep the foundation horror stories from happening, that we want to make sure that the engineers are doing their jobs and that the foundation committee needs to put in some meaningful requirements. The workshop committee agreed. Les Albin stated that the city needs three things to make this work. 1) Set a standard that everyone has to follow. 2) A list of who is responsible for what.3) The City has to know what is going on and to make sure the right people are on site. Marie Starich P.E., and Michael Skoller P.E., continued to discuss the different types of foundations designs, observations and testing. They continued to discuss what is required from the pier layout to the slab and grade beams. Dennis Mack and Jim Dougherty indicated that they would come up with a certification/document that the City could require the engineer to sign. Jim Dougherty stated that he would make the changes and work in the modifications. [Adjournment.] Meeting adjourned at 8:15 p.m. 3800 University Boulevard • West University Place, Texas 77005-2899 0 713066804441 0 www.westu.org Building and Standards Commission Meeting Minutes July 20th, 2004 Page 2of 2 5- PASSED THIS AY OF • , 2004. 34 Bryant Slimp, C airma ` ATTEST: 6wa f?~j Ms. Annette R. Arriaga Development Services c etary